Our colleagues from the division Roads are still successfully progressing with the construction of the D1 motorway in Slovakia in the Hubová–Ivachnová section. Ondřej Tomek and Rodrigo Portillo, on behalf of OHLA ŽS, shared the current status of works on this major construction project with students of the Faculty of Civil Engineering at the Czech Technical University (ČVUT) in Praha at the end of February. Once again, we joined the series of Technical Thursdays lectures organized by the ČVUT for students and companies.

Students could learn interesting information about the construction process, e.g. details about the Likavka intersection, which is one of the dominant features of the D1 Hubová–Ivachnová section. The main bridge structure SO 210-00 carries the motorway across a wide valley, the first and third class road and part of the village of Likavka, while the exit or entrance ramps provide a full-fledged connection between the Dolný Kubín–Ružomberok road and the Bratislava–Košice motorway.
Another interesting feature is, for example, the unique technical design of the flyover of the stability measure SO 101-00 (2) F, which carries the motorway over the landslide area for a length of 200 meters. The complicated landslide on this part of the section could not be contained by conventional elements. Therefore, an overpass over the landslide was designed, based in shafts 18 meters deep, to protect the substructure of the bridge from the adverse effects of the earth pressures of the geologically unstable area.



