Since 2023, our company has been involved in a research and innovation project focused on new construction materials, substances, and technologies, supported by the grant programs of the Technology Agency of the Czech Republic. In January, a third project was added to the two ongoing ones.

The first innovation project supported under the Sectoral Program Transport 2020+ by the Technology Agency of the Czech Republic
“Tunnel Lining Reinforced with Composite Materials with Increased Durability and Resistance”
Project ID: CK04000283
Project Duration: 01/2023 – 06/2026
The aim of the project is the research and development of a primary load-bearing precast concrete segment for tunnel lining, fully reinforced with GFRP (Glass Fiber Reinforced Polymer). This type of segment will be developed with a focus on long-term durability in aggressive environments, which may originate either from the surrounding ground or the interior of the tunnel due to traffic-related effects. Another crucial aspect is developing a GFRP-reinforced precast segment resistant to extreme loading, especially fire. A methodology for testing tunnel linings with FRP reinforcement under fire conditions will be prepared, and a verified reinforcement technology using FRP will be developed.
Participants:
- OHLA ŽS, a.s. – Grant recipient – Ing. Zdeněk Mlýnek, Ing. Peter Čulík
- K.B.K. fire, s.r.o. – Co-recipient
- Prefa Brno, a.s. – Co-recipient
- PREFA KOMPOZITY, a.s. – Co-recipient
- Brno University of Technology – Lead research institution
Key project personnel at our company are Ing. Zdeněk Mlýnek and Ing. Peter Čulík from the Roads Division.
Funding Source: This project is co-funded with state support from the Technology Agency of the Czech Republic under the 4th public competition of the Transport 2020+ program.
Second research project on innovative reinforcement for concrete structures began in May 2023.
“New Bendable Thermoplastic Reinforcements for Better Durability and Sustainability of Concrete Structures”
Project Duration: 01.05.2023 – 30.04.2026
Project ID: TH82020005
Participants:
- OHLA ŽS, a.s. – Application guarantor – Ing. Petr Široký, Ing. Jan Šibal, David Bilavčík, East Division
- Brno University of Technology, Department of Concrete and Masonry Structures
- UNIVERSITAT POLITÈCNICA DE CATALUNYA, Spain
- HORMIPRESA NEC, S.L., Spain
- ARKEMA FRANCE Groupement de Recherches de Lacq, France
- CANOE, France
- SIREG GEOTECH s.r.l., Italy
- Arkema Group, France
Key project personnel at our company: Ing. Petr Široký, Ing. Jan Šibal, and Mr. David Bilavčík from the East Division.
This applied international research project focuses on concrete structures that must exhibit high durability and mechanical performance, aiming for a service life equal to or longer than current regulations recommend, especially in aggressive environments.
Funding Source: This project is co-funded with state support from the Technology Agency of the Czech Republic under the EPSILON program within the ERA-NET Cofund M-ERA.NET Call 2022.
This project is funded under the National Recovery Plan through the European Recovery and Resilience Facility.
In December 2024, our company successfully signed a contract with the Technology Agency for the third research project
“Prospective Pavement Subbase Layers with Efficient Use of Secondary Raw Materials from the Transport Industry and By-products from the Energy Sector”
Project Duration: 01.01.2025 – 31.06.2028
Participants:
- OHLA ŽS, a.s. – Grant recipient and application guarantor
- Brno University of Technology, Institute of Building Materials and Components Technology – Lead research institution
Key project personnel at our company are Ing. Zdeňka Witalová, Ph.D., from the company headquarters, Daniel Loveček, Zbyněk Rauš and Ing. Pavel Kocanda, Ph.D. from the East Division.
One of the main focuses of the project is implementing currently hard-to-utilize waste materials into material mixtures suitable for road subbase layers. One example of such waste is reclaimed dust produced in asphalt plants during aggregate cleaning. This material is generated in large quantities and is difficult to reuse due to its fine grain size and other properties. Other waste materials that will be used within the scope of the project include the END product and slag from energy recovery processes, fly ash and bottom ash from biomass combustion, brake pad dust and recycled asphalt, concrete and mixed aggregates. Based on analysis results of potential secondary materials, their use as binders, fillers, or aggregates will be proposed. Subsequently, base mix designs will be developed and validated for applications like clay soil stabilization, new subbase layers, cement mortar for gravel grouting, or asphalt concretes. All designs will be selected with the aim of maximizing the savings of primary raw materials. In case of soil stabilization, secondary materials with higher lime content such as END product and biomass fly ash will be preferred. The subbase layer will primarily be made using recycled materials combined with reclaimed dust and ashes. Gravel grouting mortar will be based on END product and other ashes mixed with composite binders. The use of primarily reclaimed dust from asphalt mixing plants, the END product, slag, and, for example, dust from brake pad manufacturing is anticipated for asphalt concrete.
Funding Source: This project is co-funded with state support from the Technology Agency of the Czech Republic – 2nd public competition of the Transport 2030 program.
More information available at www.tacr.cz