We officially opened the D1 Hubová–Ivachnová highway. The Ružomberok bypass will ease traffic congestion and benefit residents .

Our consortium has completed and opened to traffic a nearly 15-kilometer section of the Slovak D1 highway, which forms the northern bypass around Ružomberok.
The project involves the construction of 14.92 km of new highway, which will divert transit traffic away from the city and save drivers up to 16 minutes of travel time. The new section includes 19 bridges with a total length of nearly 4 kilometers, the 3.6-kilometer-long Čebrať twin-tube tunnel, and 3 grade-separated interchanges. The highway route also crosses the Váh River and a railroad track twice along its path.
Due to the exceptionally complex landslide-prone terrain, the route had to be rerouted during construction and the tunnel significantly lengthened. The foundation work therefore required unique technical solutions —special shafts protect the bridge piers in active landslide areas, and near Ivachnová, a massive 140-meter concrete gallery was built, which is completely covered with soil and goes unnoticed by drivers as they pass through. Beneath the highway, construction workers even stumbled upon previously unknown chambers of a stalactite cave.
Teams from across our entire company played a significant role in the project’s implementation—the Roads Division, the Slovakia Division, and the Technology Division, which provided all of the tunnel’s technological equipment.
You can watch a summary video here.
We carried out the construction project as the lead contractor for the National Highway Company (NDS).



