On Wednesday, February 14, the construction of a new exhibition hall for the Public Transport Museum of the Prague Public Transit Company (Dopravní podnik hl. m. Prahy, DPP) was ceremoniously started in the premises of the Střešovice depot. It will be built by our colleagues from the division West within 20 months and its opening to the public is planned for September 2025.

The new exhibition hall will be located in the lower yard of the depot, in a previously unused area, and will be embedded in the slope descending towards Na Ořechovce street. The project is adapted to the sloping terrain with a complicated access. The entrance to the lower floor, which will resemble a bus garage in its design, will therefore be from Na Ořechovce street. There will be a showroom on the upper floor, used for the display of road vehicles, which will change on a regular basis in the exhibition.
The hall will be used to display historic buses and road work cars from the collections of the Public Transport Museum, which are technical monuments of the Czech Republic and are temporarily kept in protected halls in the DPP garages in Klíčov, Hostivař and Řepy.



