On the first of November, the ward block reconstruction of the home for the elderly in Břeclav ceremonially started. The pavilion A modernization, costing 116 million crowns, and being carried out by the companies SYNER and OHLA ŽS, is expected to be completed by the end of next year.

The gradual reconstruction of the home for the elderly in Břeclav is one of the city’s priorities. It is required not only because of the dismal state of the building dating from the 70s and 80s but also as a result of the changing composition of the home’s clients and new legislative requirements. Thanks to the ward block reconstruction, the entire pavilion will be wheelchair accessible. An evacuation elevator and electronic fire protection will be installed. Internal construction modifications will change the layout in such a way as to increase the comfort and standard of living. In addition, a completely new residential floor is going to be built, and the attic is going to house facilities for employees, missing until now.
The management of the home for the elderly had been preparing for the reconstruction for several months: as it is not possible to reconstruct the building while in operation, it was necessary to find temporary replacement housing for approximately one hundred clients. The South Moravian Region helped with the moving, accepting some of the clients in its facilities, while others are going to spend the repair period with their families or in a nursing home.



