The field Division R – Transport Constructions operates nationwide in the area of road construction in the Czech Republic and Slovakia with focus on the construction and reconstruction of roads, motorways and other communications in cooperation with the regional divisions of the company.

The division further specializes in the construction and reconstruction of bridges and tunnels, rehabilitation of reinforced concrete structures and trenchless technology in the form of complex supplies. A long-term cooperation with Division Z – Railways in the area of bridge and tunnel construction is very important.

The subsidiary of Boskovice Bituminous Mixing Plant is also organizationally incorporated into Division R – Transportation Constructions whereby we provide the production of asphalt mixtures.

One of the largest and most up-to-date constructions of the division is the construction of a part of the Slovak highway D1 – Ruzomberok bypass in the section Hubová – Ivachnová.

Structures of reference

Contacts

OHLA ŽS, a.s.

Divize

Dopravní stavby

Drážní 11
627 00 Brno – Slatina
dopravnistavby@ohla-zs.cz