On the International Children’s Day on Saturday 1st June, the town of Hodonín planned a grand opening of the reconstructed House of Nature on the edge of the site called Bažantnice. The reconstruction and completion of the former kindergarten building was carried out from the beginning of 2022 to autumn 2023 by our colleagues from the division East.

The modern building with a distinctive wooden structure will serve as a visitor centre and gateway to the nearby Hodonínská Dúbrava. This national natural monument is one of the most valuable botanical sites in the Czech Republic and is also home to many endangered animals, including the horned beetle. The building was given a distinctive look using wooden elements by the studio Létající inženýři, which prepared the architectural design. The same studio, in collaboration with the Per Partes studio, also designed the garden, which surrounds the House of Nature and is itself one large exhibition.
At first glance, the form of the second floor is particularly striking. The superstructure has an all-glass wooden structure, covered with movable blinds. Its interior space is decorated with a stylized representation of a light forest of Hodonínská Dúbrava,with many interactive elements for visitors.
The total cost of the project, including the exhibitions, amounted to 109 million crowns and was also financed by the Operational Programme Environment, the State Budget from the National Restoration Plan through the Ministry of the Environment, the Karel Komárek Foundation and the South Moravian Region. This year, the Hodonín House of Nature won 2nd place in the Building of the South Moravian Region 2023 competition in the category of Reconstruction of Buildings.



