At the beginning of September, the new extension and renovated premises of Pavilion C at České Budějovice Hospital were officially opened. The construction work was carried out over the course of less than a year by a project team from the West Division in cooperation with Metrostav DIZ.

The main objective of the project was to reconstruct and build a total of seven operating theatres and a resuscitation unit for the cardiovascular and thoracic center, including the modernization of support facilities. The theatres are equipped with the latest medical and audiovisual technology. Moreover, they are standardized to match the layout of other operating rooms in the hospital, ensuring the same setup for surgical and support staff.
The resuscitation unit has been significantly expanded, with part of its capacity placed in separate glass-enclosed isolation rooms. These rooms feature switchable glass that can be made transparent or opaque as needed, eliminating the need for hygienically unsuitable blinds.
The extension above the driveway to Pavilion C’s supply yard was built to include not only support facilities for the operating theatres, such as staff rooms, a changing room, and a canteen, but also a backup central sterilization unit. As part of the renovation, all ventilation units were completely replaced.
The creation of these state-of-the-art, highly specialized medical facilities will enhance the safety and quality of patient care while also improving working conditions for hospital staff.
The total cost of the project, including design and related expenses, reached CZK 278.5 million excluding VAT.



