The project focused on the modernisation of the large railway junction Žilina, which is located on the international PAN-European corridor. The modernisation included four railway stations: Žilina-seřaďovací nádraží (marshalling yard), Žilina-osobní nádraží (passenger station), Žilina-Teplička and Varín railway station, together with the connecting line sections Žilina-Strážov (direction Púchov), Žilina-Budatín (direction Čadca), Žilina-Varín and Varín-Strečno (direction Poprad). The entire project covers a length of approximately 14 km in the west-east direction and 2.3 km in the north-south direction. Furthermore, the project encompassed the railway stop “Zastávka Žilina odbočka” and the Váh turnout in the Žilina-Varín section. After modernisation, the line allows a maximum speed of 160 km/h.

The aim of the project was to improve the technical infrastructure and to meet the standards set out in the AGC (European Agreement on Main International Railway Lines) and AGTC (European Agreement on Important International Combined Transport Lines and Related Installations) agreements. The project also met the requirements of TSI – Technical Specifications for the Interoperability of European Conventional Rail Systems. In addition to the technical improvements, the upgrade was essential for the transition to more economical alternating current (25 kV, 50 Hz) traction and for the introduction of dispatch control on the upgraded sections.

Our company played a significant role as a major subcontractor through the Railways, Slovakia and Technology divisions. We were responsible for the reconstruction of the almost 5 km long double-track section Žilina-Varín, which included the Váh branch line, providing connection to the entrance, departure and transit tracks of the Žilina junction. We also provided work on bridge structures, ground structures, cable ducts, utility networks and power technology.

Basic information
Amount 323 million EUR without VAT
Commencement date 2020
Completion date 2025
Investor The Railways of Slovak Republic
Contractors in join venture