The water reservoir Vranov is located on the Dyje river and its important tributary Želetavka. It was put into operation in 1934 and is one of the oldest reservoirs in the basin. As one of the main water reservoirs under the state enterprise Povodí Moravy administration, the Vranov reservoir has a flood-control, recreation and power-producing function. The total surface area of about 760 hectares provides drinking water for a part of the Vysočina region and is a source of water for the Znojmo water reservoir.
The unsatisfactory technical condition of the dam, especially the bridging of the overflows, required its complete reconstruction in 2016. The main requirement was for the reconstruction of the dam’s crown to affect only the summer recreation seasons 2017 and 2018, which was achieved. Throughout the reconstruction, the dam was completely closed to the public and transport, and alternative transportation for tourists and visitors to the water reservoir was provided by a ferry.
The construction works consisted in a complete reconstruction of the dam’s crown, including the bridging of the overflows, the bridge abutments, the expansion joints and the existing railing on both sides of the dam. Moreover, the concrete surfaces under the crane track and the lighting on the crown underwent necessary repairs. During the construction, the old road was removed and replaced by a new one, including insulation. Last but not least, the dam’s crown has new lighting poles and new railings.
| Basic information | |
|---|---|
| Amount | 58 million CZK |
| Commencement date | 2016 |
| Completion date | 2019 |
| Investor | Povodí Moravy, s.p. |
| Designer | VODNÍ DÍLA - TBD,a.s. |
| Contractors | OHL ŽS |