The main goal of the renovation of the Kladruby Monastery area was the rehabilitation of the monument’s significance and the protection of its historical values. Emphasis was placed on the repair of the existing buildings of the New and Old Convents and the Paradise Courtyard, that is their parts through building modifications, maintenance works, landscaping and garden improvements, including wheelchair access for visitors. The renovation of the individual monastery parts was conducted under the auspices of the Kladruby Monastery – Life in the Order project.

The buildings of the New and Old Convents were completely renovated. The visitor tour circuits and installations were extended, and the renovated Paradise Courtyard of the Old Convent was open to the public. The courtyard itself was modified as an exhibition: a combination of the typical design of the Paradise Courtyard with a fountain and a monastery garden.

The renovation of the New Convent premises included the renovation of the first two floors with full rehabilitation of the two main and one secondary staircases, equipped with an elevator for wheelchair access and the transfer of furniture to depositories. A full rehabilitation of the New and Old Convent corridors was done, including the original levels and tiles of their floors, probable baroque painting, copies of baroque doors and windows.

The original western part of the Old Convent was rehabilitated according to the project to its original late baroque form, including the restoration of the baroque fresco in the chapel. The convent hall and its stone paving were fully restored.

Following the exposition content, namely the monks’ life, the Paradise Courtyard premises were restored to their original baroque style, including both access staircases. The artistic and spiritual concepts of the Paradise Courtyard, lined with eaves walkways and packed gravel paths, together with the planting design, develop the concept of the paradise garden: they respect its traditional division, the rectangular composition of the paths and the flower beds, and enrich it with plants related to the decoration of the church and to the original outdoor gardens.

The entire area of the monastery is a listed national cultural monument: the Benedictine Monastery of Kladruby with the Church of the Assumption of Mary, registered in the Central List of Cultural Monuments of the Czech Republic.

Basic information
Amount 109 million CZK without VAT
Commencement date 2020
Completion date 2022
Investor Národní památkový ústav
Designer FACIS architects
Contractors OHLA ŽS, a.s.