The project focused on the reconstruction of the intersection of I/16 – I/72 – II/531 in Rimavská Sobota.
The aim of the project was to reconstruct the existing intersection into a four-leg two-lane roundabout with a diameter of 50 metres, complete with a new pedestrian crossing and a 350-metre-long noise barrier. It was imperative that this project be completed to enhance the safety and efficiency of traffic flow at this key junction that had not undergone an upgrade since the 1980s.
To minimise disruption to traffic on the busy I/16 and I/72 roads, the work was carried out in two phases. The first phase, lasting until December 2023, comprised the relocation of utilities such as water mains, telecommunication and fibre optic cables, the construction of a noise barrier wall, the widening of roadways and the layering of the final asphalt layers. Although it became apparent during implementation that the road subgrade was in a substandard condition and had to be completely replaced at a depth of up to one metre, all work was completed on schedule.
The second phase, which took place between March and June 2024, comprised the completion of the remaining sections, the installation of public lighting, the installation of road markings and other finishing works. The entire project was handed over to the investor in June 2024, two months ahead of schedule, despite complex technical challenges such as subgrade replacement.
The project was well received not only by the investor, but also by the local authorities and residents.
| Basic information | |
|---|---|
| Amount | 3,7 million EUR without VAT |
| Commencement date | 2023 |
| Completion date | 2024 |
| Investor | Slovenská správa ciest |
| Contractors | OHLA ŽS |
