One of the main constructions of the Pilsen railway junction modernization has been finished. The main part of the project was the reconstruction of the Mikulášská street bridging in the city center while ensuring a minimal impact on railway transport, public transport lines, as well as on one of the principal roads.

The extension of the bridge structure for both bridges, which have served their purpose for over 100 years, has significantly improved the road transport quality and the safety of other road users. The extended space under the bridges also allowed to build a separate cycle track along the sidewalk in the direction from the center to Slovany.

The construction of new platforms, as well as the construction of a new passenger station layout has generally improved the railway infrastructure standard while maximizing passenger comfort and railway safety. A separate part of the construction represented works at the stabling station, during which the remaining tracks were dismantled and two new stabling tracks used for passenger carriages maintenance and potential armament were built in their place.

After the completion of the construction works, the Pilsen railway station manages to combine contemporary modern and functional requirements for rail transport with historical elegance and monumentality. The entire area in front of the station including the adjacent retaining walls has been completely rebuilt. Its new look is very dignified and modern, incorporating elements that refer to the art of our ancestors. More than 60 cars are able to park in the car park in front of the main entrance to the station building, in the case of public transport interruption, the car park can also be used for replacement bus services.

Basic information
Amount948 million CZK
Commencement date2016
Completion date2019
InvestorSŽDC,Statutární město Plzeň
DesignerSUDOP
ContractorsIn joint venture