The reconstruction project was initiated with the objective of enhancing safety and comfort for passengers, facilitating railway accessibility, and optimising the capacity of railway transport in the eastern part of Prague. The aim was also to remove local speed restrictions and ensure full barrier-free accessibility. The project covered a total of 14.7 km of track and included the reconstruction of the railway stations Praha-Vysočany and Praha-Horní Počernice, three railway line sections and the introduction of modern solutions designed to increase the competitiveness of rail transport in the region.

The original passenger building at Prague-Vysočany station has been replaced with a new, more accessible and modern facility. Three new roofed platforms with barrier-free access have also been constructed. Escalators and lifts provide passengers with comfortable access, both from the new underpass and from the reconstructed old one. Prague-Horní Počernice station has undergone a complete modernisation of the track and received a new platform at track No. 1 for the direction Lysá nad Labem, while the previously built island platform No. 3 has been retained.

The Skály branch line has been converted into a switching station, which, with the use of rail couplings, enables efficient use of the three-track section between the Skály switching station and the Praha-Vysočany station for both the Lysá nad Labem – Praha-Vysočany line and the Praha – Turnov line. This section has been newly complemented by the Rajská zahrada stop, conveniently situated near the eponymous B metro station, thereby considerably improving the interchange links between rail and public transport.

The reconstruction also encompassed two double-track line sections, Skály – Praha-Horní Počernice and Praha-Horní Počernice – Mstětice. The second section included the reconstruction of the Zeleneč stop, which now has been fitted with new barrier-free access via a modern underpass and a safer layout for passenger access.

To optimise the capacity of the line sections, three temporary switches were set up at the outset of the construction phase to increase the capacity and thus minimise traffic restrictions during the construction process.

This comprehensive project will contribute to improving transport infrastructure and accessibility, thereby strengthening rail connections in the region.

Basic information
Amount 2,4 billion CZK without VAT
Commencement date 2020
Completion date 2024
Investor Správa železnic
Contractors in join venture