The reconstruction of a former school into a library and a lifelong learning center have been done in that project. The buildings also house the city tourist information center, the municipal archive and a café. The buildings are located in the historic city center, in a densely built-up area.

The original building has been reconstructed retaining the original features as much as possible. At the same time, it has been cleaned of additional unsuitable extensions to that building. In the inner part of the block, a modern and partially glazed outbuilding has been built, sensitively complementing the space. The second part of the extension is a monolithic structure, which, from the architectural point of view, consists of more than sixty differently arranged windows reminiscent of books placed on a shelf from the outside.

A part of the construction works consisted in the construction of wheelchair accesses. Therefore, it was necessary to unify the different floor heights and two elevators run to the aboveground floors. In addition, there are many specialties in the building: hand-made floor tiles imported from Taiwan were used on the corridor floors in the existing section because no other manufacturer had been able to meet the architects’ requirements. Another example is a wall of 2.5 × 3.5 meters composed of 11 111 pencils.

Basic information
Amount 151 million CZK
Commencement date2017
Completion date2019
Investor Město Písek
Designer studio ABS spol. s.r.o.
Contractors OHL ŽS