The purpose of the project was to put 17 km of the double-track railway section Přerov-Olomouc into construction-technical condition which corresponds to the parameters to increase the line speed up to 160 km/h and at the same time to increase the throughput for transporting more voluminous cargo. The section is located on an important international railway corridor.
The subject matter of the modernization was the redevelopment of the railway substructure, the reconstruction of the railway superstructure. It was important to build platforms and grade accesses to railway stations and stops as well as the solution of safe barrier-free accesses to the island platforms, as well as the passenger shelters and noise control measures. The reconstruction of railway objects – bridges, culverts. An important part was the modernization of the signalling and communication equipment and the installation of high-voltage equipment and overhead lines.
| Basic information | |
|---|---|
| Amount | 1,88 billion CZK |
| Commencement date | 2005 |
| Completion date | 2006 |
| Investor | SŽDC |
| Designer | SUDOP Brno, MORAVIA CONSULT Olomouc |
| Contractors | In joint venture |