The bridge number 333-003 in Přelouč is a historic weir bridge over the river Labe. Together with the hydroelectric power plant, the lock, the weir and its control tower brick buildings, it forms a complex engineering work. Due to the fact that the bridge, as part of the waterworks complex, is a listed technical monument, the project had to respect the original design. The reason for the repair was not the emergency condition of the bridge, but the poor technical condition of the supporting structure and accessories of the bridge. It involved the replacement of pavement layers, insulation, slope layers of the supporting structure, and expansion joints. Furthermore, the bearings of the raised inserted fields as well as the ceiling of the load-bearing structure were renovated, and a completely new monolithic railing with retrofitting of the original period decorative filling was installed.
The bridge reconstruction took place at full road closure, at the same time it was necessary to coordinate demolition and construction works so that one of the two weir fields always remained in operation. Despite the technical complexity resulting from the atypical nature of many elements and high demands on careful coordination of the works by the construction management, thanks to a precise cooperation and a constructive approach of the National Monuments Institute employees, the building department of Přelouč Municipal Office, the technical supervision and the client, Povodí Labe and the hydroelectric power plant Přelouč, the project was completed in time.
| Basic information | |
|---|---|
| Amount | 33,4 million CZK without VAT |
| Commencement date | 2021 |
| Completion date | 2021 |
| Investor | Pardubice Region |
| Designer | MDS projekt s.r.o. |
| Contractors | OHLA ŽS, a.s. |