The main goal of this project was to increase the competitiveness of rail transport. This was achieved mainly by increasing passenger comfort and safety by building new platforms with a platform edge 550 mm above the track and wheelchair accesses. In addition, a new information and a signaling system were installed, and the travel time was reduced. On the one hand, the speed in the Šakvice–Hustopeče line was increased to 85 km/h, and on the other hand, a direct connection was introduced from Hustopeče to Brno without the need to change trains at the Šakvice railway station. After the reconstruction, the travel time on this route was reduced to 35 minutes.

At the Šakvice station, which lies on the double-track corridor electrified railway line Brno–Břeclav, there was a partial change in the configuration of the track enabling the above-mentioned direct connection. A new underpass was built under the entire track, connected by wheelchair access ramps to one already existing and another newly built island platform. The station signaling and communication systems were also reconstructed.

The Hustopeče station was completely reconstructed. The brand new constructions include two transport tracks with two external platforms, which enable a quick and comfortable change to buses, and one handling track with a new loading area. Apart from that, the reconstructed station building houses a new interlocking equipment box, a transport office, a ticket office, a small waiting room as well as sanitary facilities for the passengers. The new station signaling system is a 3rd category of the electronic interlocking type and is controlled from the Přerov central control room.

In the Šakvice–Hustopeče line section, which is about 6 km long, a part of the line was relocated to a new position to allow an increase in line speed. The subgrade and the superstructure, five crossings as well as nine culverts were reconstructed. The track-side signaling system is a 3rd category of the automatic block type without block signals.

A new traction line of the 25kV 50Hz AC traction system, which includes supports, was set up in the line section and at the Hustopeče station. The power supply of this section from the traction line of the existing Břeclav–Brno railway line is enabled by the construction of a new switching station in the Šakvice station.

Basic information
Amount 1,55 billion CZK
Commencement date 2019
Completion date 2021
Investor Správa železnic
Designer SUDOP Brno
Contractors In joint venture