The main objectives of the three-kilometer section renovation of the defunct line from Hrušovany u Brna to Židlochovice were to restore the railway operation after 40 years and to increase the railway competitiveness in comparison with congested roads.
The construction was preceded by a long-term interest of the South Moravian Region and the inhabitants of Židlochovice in the extension of the Integrated Transport System. At the same time, the project followed the construction of a new transport terminal in Židlochovice in the immediate vicinity of the station.
The project included electrification of the line and the necessary change of track layout in Hrušovany, where one island and one external platform were built. Two new platforms with wheelchair accesses were constructed in Židlochovice. The railway superstructure and substructure including the drainage system, two bridges, as well as three secured crossings and one pedestrian crossing were also reconstructed. The station building in Židlochovice got back its original appearance from the period from about a hundred years ago. Safe operation is ensured by a new signaling technology, which is remotely controlled from the central dispatching center in Přerov. Last but not least, the line speed was increased to the maximum of 80km/h.
Thanks to this complete reconstruction, the direct train connection from Židlochovice to Brno has been restored.
| Basic information | |
|---|---|
| Amount | 722 million CZK |
| Commencement date | 2018 |
| Completion date | 2020 |
| Investor | SŽDC |
| Designer | SUDOP Brno |
| Contractors | In joint venture |