The main motive behind the construction of this architecturally distinctive element of Košice was the decision to build a modern football stadium for local players which will meet the requirements of the UEFA 4th category for league, international and representative matches. In addition to that, the arena can be used for other sports and cultural events.

The construction of the arena was divided into three stages, of which the first one has been completed. As for the other two stages, the playing field and the foundation for two more grandstands, which will be completed in the future, have been built. The architecture of the stadium consists of a distinctive dynamically shaped disk with a perforated sheathing “levitating” around the concrete and steel supporting structures of the individual stands and above the transparent security fencing which separates the inner walkway of the stadium from the surrounding public area around the arena.

The overall dimension of the stadium with the grandstand is 154.15 × 114.15 meters with the main building’s spikes projecting towards the west. The playing area, whose dimensions are 105 × 68 meters, is equipped with accessories such as a drainage system, an automatic sprinkler, hot water heating and a weather station.

As part of the construction of the arena, two large-capacity parking lots have been built. The main building has four floors on which there are rooms for journalists with glass walls, TV studios, skyboxes, office spaces and the production rooms.

After the completion of the remaining two stands in the area behind the goals, the football arena will have a total capacity of 12,658 spectators.

Basic information
Amount 14 milion euros
Commencement date 2018
Completion date 2021
Investor The City of Košice
Designer Hescon Architektonicko inžinierska kancelária
Contractors In joint venture