The new internal medicine pavilion at the AGEL Hospital in Šternberk is designed as a low-energy passive construction with a photovoltaic system on the roof. The building, designed by Adam Rujbr Architects, offers significant comfort for the patients – “hotel” type facilities consisting of spacious en suite double rooms. As the internal medicine pavilion used to be in a historic, 120-year-old building, the project to build the new pavilion represented a major shift towards modern patient care of the 21st century.
The new building is located where the former headquarters building used to stand, adjacent to the main building, which houses the ARO, the surgery as well as the radiodiagnostic ward. Thanks to an above-ground corridor connecting these buildings, the healthcare professionals can move patients around comfortably for further examinations.
The new pavilion consists of an underground floor, where the building’s technical facilities and staff locker rooms are located, and four above-ground floors. An outpatient part with specialist examination rooms is on the first floor. The second and third floors house standard bed wards, with thirteen double rooms on each floor. An ICU with ten beds in a box system is located on the fourth floor.
The building is low-energy and completely self-sufficient, with a photovoltaic on the whole of the roof and a water recovery system. The Šternberk pavilion was inspired by the Clinic of Internal Medicine – Gastroenterology and Geriatrics in the University Hospital Olomouc. This construction meeting passive building standards was built by our company according to the design of Adam Rujbr’s studio in 2018.
| Basic information | |
|---|---|
| Amount | 293 million CZK |
| Commencement date | 2019 |
| Completion date | 2022 |
| Investor | AGEL Středomoravská nemocniční a.s. and Olomoc Region |
| Designer | Adam Rujbr Architects |
| Contractors | OHLA ŽS |