The great urban circle in the Bauerova-Žabovřeska direction is part of the basic communication system (ZÁKOS Z-67) of Brno city, but also the road network of the Czech Republic. The most important construction objects are communications.

They consist of so-called great urban circle communication branches and they are two to four lane communications in the length of 1160 m. Part of the building is also communication in the streets Hlinky-Pisárecká. Another significant part of this junction is a tram line. The main object is the new routing itself consisting of a grade crossing and roads. Part of the route is a 70m tramway underpass where one tram stop is located. Bridges buildings are also part of the construction, including a 318m long great urban circle bridge formed by a monolithic concrete structure, based on 1200mm pillars which is the dominant feature of the entire construction. The construction also includes bridges – the bridge over the tramway underpass under a road, the bridge over Svratka river in Pisárky and the bridge over Svratka – Kamenný Mlýn. Another important part of the great urban circle construction is the technological work which deals with mechanical tunnel ventilation, traffic information system, emergency call, electrical security signalling, etc. The construction was fully operational throughout the construction.

Basic information
Amount2,28 billion CZK
Commencement date2003
Completion date2007
InvestorŘSC ČR
DesignerPK OSSENDORF
ContractorsIn joint venture