This construction represents the first of the three parts of the Olomouc–Šumperk national line modernization. Its total length is 29.5 km and consists of four railway stations (Bohuňovice, Šternberk, Újezd u Uničova and Uničov) and four line sections with the stops Hlušovice, Štarnov, Babice u Šternberka, Mladějovice and Uničov zastávka.

The capacity and the competitiveness of railway transport in this section was enhanced by electrifying the line with a direct current traction system (DC 3 kV) and increasing the speed to 160 km/h. The reconstruction involved the railway superstructure, substructure, platforms with a platform edge 550 mm above the track at all stations and stops, as well as 18 railway crossings, 15 bridge structures and 31 culverts. New premises were built for the new signaling, communication and high-current technologies, and cable ducts were set up at all stations. A new DC 3kV traction line was built over all the reconstructed tracks with a total length of almost 42 km. The power supply of the line is provided by new traction supply stations TMP Olomouc, TNS Šternberk and TNS Uničov. Furthermore, for the entire branch of the Olomouc–Šumperk line, the power supply from the new TMP Hrabišín and the modified TNS Šumperk is planned. The communication system in the stations and stops includes radio and information systems, a camera system, an electric fire and security signaling (EPS, EZS) as well as transmission systems. The station and track signaling system is a 3rd category one. The crossings are, with regard to the line speed of up to 160 km/h, equipped with a light signaling system with full barriers. For the entire Olomouc–Šumperk line section, a remote-controlled signaling system from the Olomouc central control room and the introduction of the European train protection system ERTMS are proposed.

It is planned to introduce high-speed trains in the Olomouc–Šternberk–Uničov section with the travel time of 17 minutes with the frequency of 60 minutes at rush hours and trains stopping at all stations and stops in the Olomouc–Uničov section with the travel time of 26 minutes. The coordinator of the integrated transport system of the Olomouc Region envisions the introduction of low-floor electric trains RegioPanter.

The reconstruction of the second part of the Olomouc–Šumperk line, i.e. the Uničov–Libina section, in which our company is the joint venture leader, began in the spring of 2021 and will be completed (together with the third part Libina–Šumperk) in mid-2023.

Basic information
Amount 3,89 billion CZK
Commencement date 2019
Completion date 2022
Investor Správa železnic
Designer MORAVIA CONSULT Olomouc
Contractors In joint venture