The subject of this project was the reconstruction and the electrification of the monorail line in the section Uničov (excl.) – Troubelice–Libina, which is part of the national railway line from Olomouc to Šumperk. The reconstructed parts included the railway stations of Troubelice (newly only as an overtaking station without the possibility of passenger check-in) and Libina as well as the interstation sections Uničov–Troubelice and Troubelice–Libina including the stops Troubelice-střed, Troubelice and Nová Hradečná. The total length of the construction is 13.8 km.
The aim was to eliminate speed drops and increase the speed to up to 100 km/h, ensure interoperability parameters, increase the track capacity, increase railway traffic safety and passenger comfort, and ensure wheelchair access to the platforms. By the line electrification, a higher competitiveness of rail transport has been achieved. At the same time, negative effects of rail transport on the environment and the health of the population have been reduced. If necessary, the Olomouc–Šumperk line serves as a replacement (detour) route for the corridor section Olomouc–Zábřeh na Moravě.
A total of 15.2 km of the railway superstructure (49E1 on concrete sleepers) and subgrade were reconstructed. Platforms in stations and stops with a platform edge height of 550 mm above the track, 9 level crossings, 19 bridges, 30 culverts, utility networks, buildings and roads were reconstructed. New cable ducts were built in both stations. Traction line of the 3kV direct current system, including earthing to the rails, was newly built in the entire section. Last but not least, signaling, communication and high-current systems were reconstructed.
After the reconstruction, the travel time between the railway stations Uničov and Libina has been reduced from the previous 18 minutes to 12 minutes. A remote-controled signaling system from RDP Olomouc and the introduction of the European Train Control System (ETCS) were designed for the entire Olomouc–Šumperk line section. After its introduction, and using the V150 speed profile, the travel time will be further reduced.
| Basic information | |
|---|---|
| Amount | 1.651 billion CZK |
| Commencement date | 2021 |
| Completion date | 2023 |
| Investor | Správa železnic |
| Designer | MORAVIA CONSULT Olomouc |
| Contractors | In joint venture |