The Simulation Centre (SIMU) of the Faculty of Medicine of Masaryk University is the most up-to-date simulation centre in Central Europe and the largest one in the Czech Republic. Its building simulates, besides other things, a real hospital environment, including an emergency department, a surgical department with operating theatres, as well as a maternity ward. This unique place, aimed at practical training of medical students, offers new educational possibilities by introducing teaching methods that support active learning, and improve communication and decision-making skills and teamwork.

SIMU is unique not only in its size, but also in its architectural concept. The centre is located in the eastern end of the university campus between existing buildings of the Morphology and the Emergency Medical Service of the South Moravian region, and therefore it forms an entrance gate to the campus. It is structurally divided into two various parts. The five-storey compact building with an inner atrium represents the southern part of the building and its loadbearing structure is a concrete frame construction. The northern steel part, which has the shape of an irregular trapezoid, forms a bridging element over the Kamenice street. This part consists of three main platforms (at the 3rd and 4th floor levels of the compact building), as well as a green roof at the 5th floor level with an inner atrium. The steel structure also serves as a loadbearing structure for the facade which is formed by gold perforated metal plates.

The ground floor of the modern building simulates an emergency department with a fully equipped mock-up ambulance car. The second floor is used for simulated dental education and there are training halls and laboratories. The fourth floor simulates a real hospital environment where operating theatres, intensive care units as well as standard hospital rooms are located. The centre’s equipment includes so-called virtual patients and a wide range of simulators such as an advanced patient simulator, a neonatal simulator, an artificial ventilation simulator and others.

The construction of the Simulation Centre was co-financed by the European Structural and Investment Fund within the Operational Program Research, Development and Education.

Basic information
Amount 573 million CZK
Commencement date 2018
Completion date 2020
Investor Masaryk University in Brno
Designer AiD team
Contractors In joint venture