The building of the South Bohemian Scientific Library is an integral part of a composition of buildings, where the terrace of the memorial to the victims of fascism and more than a hundred-ton boulder from the Novohradské Mountains play an important compositional role. The boulder, which had its place in front of the library building and hindered the planning of its extension, was moved away before the project realization.
The library was extended by means of a “levitating” single-storey annex building that is linked to the existing premises at the original entrance point. At the same time, a new wheelchair access was built. The project also included the reconstruction of the first floor of the existing building, which together with the new addition allowed to create a free choice area for more than 100,000 volumes of books that had been in storages.
The annex building has one above-ground floor and a basement, where technical facilities, a repository, as well as a parking lot are located. The external shading system consists of vertical copilit glass slats. Its appearance and physical characteristics aesthetically improve the building’s look, and provide shading and natural lighting for the interior space. The interior is illuminated by squared aluminum skylights in the roof. In addition, the whole building has a maintenance-free green roof.
The new building has many specifics, such as the overall concept of glass slats, which was designed exclusively for this project. This unique shading system has not been used on any other construction project in Europe.
| Basic information | |
|---|---|
| Amount | 165 million CZK |
| Commencement date | 2019 |
| Completion date | 2020 |
| Investor | Jihočeská vědecká knihovna in České Budějovice |
| Designer | Kuba & Pilař architekti |
| Contractors | OHL ŽS |