In mid-April, we were delighted to receive several prestigious awards for construction projects realized by OHLA ŽS. These honors were presented at the award ceremonies for the Building of the Year of the Olomouc Region and PRESTA South Bohemia competitions.

The first achievements came during the announcement of the PRESTA South Bohemia 2022–2024 competition, which took place on April 10 in České Budějovice. This event highlights high-quality construction projects that contribute to regional development and improve the quality of life for local residents. An expert jury recognized three projects completed by our company.
The title in Category I.N – Public and Industrial Buildings – New Constructions was awarded to the BUDEX HUB Planá project. The jury praised this exceptional timber construction not only for its unconventional design but also for its use of renewable energy sources.
The second title was awarded to the project Restoration of the Raw Water Line Římov–Plav, Stage II, in Category III – Water Management and Environmental Constructions. Here, the jury commended the precise execution of large-diameter steel piping alongside the existing supply line.
An honorable mention in Category I.N – Public and Industrial Buildings – Reconstructions was given to the Extension, Superstructure, and Structural Modifications of Pavilion CH, České Budějovice Hospital, Stage II. The jury particularly appreciated the high-quality workmanship carried out while maintaining full operation of all hospital departments.
On April 11, the Building of the Year 2024 of the Olomouc Region awards ceremony took place in the Red Church in Olomouc. It was almost symbolic that the Scientific Library Olomouc – Structural Modifications of the Red Church project, realized by OHLA ŽS in a consortium, was honored here. This project received the title in Category 5 – Reconstruction and Renovation. This competition is organized by the Olomouc Region in cooperation with the Czech Chamber of Authorized Engineers and Technicians and the Association of Building Entrepreneurs.
We are very proud of the awards received and look forward to the announcement of further competitions later this year.
Photo source: Building of the Year 2024 of the Olomouc Region.



