On Wednesday, 19 November, the CEO of OHLA ŽS, Ing. Roman Kocúrek, received the Gold Medal Signum Excellentiae during a ceremonial event at the Faculty of Civil Engineering (FAST) of Brno University of Technology (BUT). He was awarded for his long-term cooperation with FAST (Industrial Board, internships, excursions, and students’ thesis work within OHLA ŽS), for supporting innovation and research (providing students and academics with access to real data and technologies on construction sites), and for advancing professional education (supporting the training of young specialists and FAST graduates within OHLA ŽS recruitment programs). The award was presented to him by the Dean of the Faculty of Civil Engineering, Prof. Ing. Rostislav Drochytka, CSc., MBA, dr.h.c., and the Vice-Rector for Studies, Prof. RNDr. Miroslav Doupovec, CSc., dr.h.c.

“I would like to thank you for the trust, partnership, and inspiration that enrich us all. I see this award not only as a personal honor but above all as recognition of the high-quality cooperation between academia and industry, and it therefore belongs to everyone involved — colleagues from practice, academics, and students alike. As a graduate of the Faculty of Civil Engineering at BUT, where I studied Structures and Transportation Engineering, I value this honor all the more. Cooperation with the faculty represents a return to my roots — to the place that shaped both my professional and personal growth,” said Ing. Roman Kocúrek.
Not only in his role as CEO of a major construction company, but also thanks to his personal passion for the field, he has long supported innovation in construction, sought efficient technological processes, reflected on the industry in broader contexts, and promoted collaboration on scientific research projects, bachelor’s and master’s theses, and now also on industrial PhD programs.
The Signum Excellentiae Medal is intended for current and former employees, collaborators from other schools, faculties, or industry, in recognition of contributions to the development of the faculty, science, education, or academic freedoms, as well as for strengthening its position and prestige in the Czech Republic and abroad. The medal is awarded in gold, silver, and bronze versions. Nominations for the Gold Medal are approved by the Scientific Board of FAST BUT in Brno.



