In mid-April, a brand-new visitor and educational centre was ceremonially opened at the birthplace of Jan Žižka in Trocnov, South Bohemia. This significantly expands the local tourist infrastructure, which is visited by around fifty thousand people annually. The construction part of the project was carried out by our Western Division.

The centre, featuring a museum exhibition and workshops, has been built on the footprint of the original farmyard established in the Middle Ages by the Augustinian Order. It sensitively complements the local archaeological open-air museum, opened in 2023, which presents life in the time of Žižka and the reign of Wenceslas IV, i.e. roughly the 14th and 15th centuries. The site attracts approximately fifty thousand visitors per year, and a further increase is expected thanks to the expanded services and new facilities.
Construction of the new centre, which includes a ticket office, refreshments and an educational section, started in April 2024 and lasted more than a year and a half. During the works, our colleagues had to deal with several technical challenges, including the protection of mature trees that needed to be preserved.
The construction works and technological equipment together amounted to approximately CZK 125 million. New infrastructure also had to be built, such as site lighting, a wastewater treatment plant and a car park. The investor is the South Bohemian Region, with part of the funding provided by EU funds.



