On Wednesday, June 15, the new internal medicine pavilion was ceremoniously opened in the AGEL Šternberk Hospital. Its operation will start in full at the end of the summer and patients and the staff can look forward to a spacious, modern and comfortable environment. The building, designed by the architect Adam Rujbr, is a low-energy passive construction with a photovoltaic system on the roof. Our colleagues from the Division Moravia started building the pavilion at the end of 2019.

The old internal medicine building (in the hospital premises) no longer met the requirements for modern patient care in the 21st century, so the hospital management decided to build a completely new pavilion on the site of the former headquarters building. This location was chosen for practical reasons because it is in close proximity to the main building where the ARO, the surgery as well as the radiodiagnostic ward are located. The new pavilion is connected to the surrounding buildings by a corridor, which allows the patients to move comfortably.
The new four-storey building has an outpatient part with examination rooms on the ground floor, bed wards on the second and third floors, and an ICU with ten beds on the top floor. In addition to the modern environment, it will also have new technical and instrumentation equipment. The total costs associated with the construction of the new pavilion amounted to almost 260 million crowns, making it one of the largest investment projects in the Olomouc Region in the last ten years.



