The construction of a ceremonial (funeral) hall next to the local cemetery in Vysoké Mýto has been completed. At the beginning of September, the building was opened to the public and will soon begin serving its intended purpose. The circular structure with a square roof has become a new landmark of modern architecture in the town. The building was constructed by OHLA ŽS, specifically the Eastern Division, in collaboration with the company GASCO.

The functional building was designed by architect Roman Brychta. Its shape symbolizes the family circle, and the bright central part contrasts with the darker surroundings. A distinctive feature of the building is the concrete prefabricated facade with a labyrinth relief, which serves both an aesthetic function and symbolically represents the winding path of life. The production of this facade was technically bold and demanding, but it contributes to the unique impression of the entire structure.
The ceremonial hall was set within a newly created cherry orchard. In the future, the area surrounding the hall will also serve as a park and a resting place for passersby.
The new building stands on the site of the former funeral hall, which no longer met modern standards. Therefore, the project was preceded by demolition and surface reinforcement. Construction took approximately two years, with total costs reaching around CZK 130 million.
You can view more details of the project in the video.
Photo source: website of the town of Vysoké Mýto



